Azure Landing Zone (CAF)

A solid, governed and automated Azure landing zone

The landing zone is the foundation of everything you will run on Azure. I design, assess and industrialize landing zones aligned with the Cloud Adoption Framework (CAF), so your teams ship fast without giving up security, governance or cost control.

Who is it for?

CIOs and platform teams starting on Azure, inheriting a legacy tenant that needs a reset, or converging many subscriptions towards an enterprise standard (banking, insurance, media, energy).

What I deliver

  • Management group hierarchy, subscription strategy, naming and tagging conventions
  • Hub-and-spoke or Virtual WAN topology: Azure Firewall, private DNS, Private Endpoints, ExpressRoute/VPN
  • Identity and access: Entra ID, RBAC, PIM, managed identities, least privilege
  • Governance as code: Azure Policy, initiatives, Defender for Cloud, budgets and cost alerts
  • Full industrialization in Terraform or Bicep with GitHub Actions / Azure DevOps pipelines
  • Architecture documentation, runbooks and knowledge transfer to the platform team

Method in 4 steps

  1. 1

    Audit and workshops

    Inventory of subscriptions, management groups, network and identities; gaps measured against the CAF; separate workshops with security, network, operations and FinOps to set the constraints (regulatory, on-premises connectivity, disaster recovery).

    Deliverable: Prioritized gap report and validated requirements

  2. 2

    Design and decisions

    Management group hierarchy, hub-and-spoke or Virtual WAN topology, address plan (AVNM, IPAM), RBAC and PIM model. Every choice is traced in an ADR, reviewed with your CISO.

    Deliverable: Architecture file and ADRs

  3. 3

    Build with IaC

    Terraform or Bicep modules, GitHub Actions or Azure DevOps pipelines with federated identity, Azure Policy as code, Checkov and tfSec checks. Deployed environment by environment, without interrupting production.

    Deliverable: Deployed landing zone, versioned pipelines and policies

  4. 4

    Handover

    Runbooks, pair code reviews, operations workshops. The platform team ships the first changes itself before the engagement ends.

    Deliverable: Runbooks and an autonomous platform team

Proof points

-87%

deployment lead time (3 days to 4 hours) on an enterprise program thanks to platform automation

Multi-region DR

automated disaster-recovery strategies through Infrastructure as Code

Governance by design

policies, security and FinOps built into the foundation, not bolted on later

Cost, timeline and deliverables of a typical engagement

Three formats, from the shortest to the most complete. Durations are orders of magnitude observed on my engagements; the exact scope and quote are set after the first 30-minute call, within 48 hours.

  • 5 to 10 days

    Assessment of an existing landing zone

    Gap report prioritised against the CAF, remediation plan estimated in days, debrief with the platform, security and network teams.

  • 3 to 6 weeks

    Landing zone design

    Architecture document (management groups, network, identity, governance), traced decisions (ADR), naming and tagging plan, estimate of recurring Azure costs.

  • 2 to 4 months

    Full industrialisation

    Landing zone deployed with Terraform or Bicep through GitHub Actions or Azure DevOps, policies and budgets in place, runbooks, and a platform team that ships the first changes on its own.

Fixed price for assessment and design, capped time-and-materials for industrialisation. The daily rate and conditions (remote, on site, duration) are stated in the proposal. No licence resale and no managed services: you own the code and the tenant.

  • Knowledge transfer included at every step (pair reviews, workshops, documentation)
  • Terraform/Bicep code delivered in your repository, under your licence
  • Weekly progress review with decision makers

Frequently asked questions

Can you work on an existing landing zone?

Yes. I assess what exists (governance, networking, identity, security, cost), prioritize the gaps against CAF and industrialize the remediation path without disrupting production workloads.

Terraform or Bicep?

Both. It depends on your ecosystem (multi-cloud, in-house skills, existing tooling). I am Terraform Associate certified and a former Microsoft MVP for Azure Infrastructure as Code.

How long does a landing zone engagement take?

An assessment takes 1 to 2 weeks. A complete, industrialized landing zone handed over to your teams usually takes 2 to 4 months depending on the network and regulatory scope.

Do you work with internal security and network teams?

Always: a landing zone is a cross-team project. Design workshops include the CISO, networking, operations and FinOps so decisions hold over time.

Discuss this with me

A first 30-minute call is free and without commitment.

Book a call

Other services

Related articles

Hands-on Azure, AKS, FinOps and agentic AI write-ups published on blog.smartcloudarchitect.fr.

All articles on the blog